Industrial Evaporation Systems
OPTIMISING PERFORMANCE

Automatic angle adjustment mechanism

Evaporator with Auto Angle Adjuster Mechanism

ACHIEVING OPERATIONAL EFFICIENCY IN ALL WEATHER CONDITIONS

MINETEK's water evaporation design and engineering use the advanced capabilities of our proprietary Environmental Management System (EMS) to optimise performance in prevailing weather conditions. To fully realise the benefits of our EMS, we highly recommend the use of our innovative hydraulic Automatic Angle Adjustment Mechanism.

The Automatic Angle Adjuster (AAA) works by automatically adjusting the angle of the water evaporator based on different wind speeds, and working in conjunction with the Environmental Management System provides flexibility for the evaporator to operate in a broad range of weather conditions.

Environmental Management System

Technical Enquiry

x

Sales Enquiry

x

Kipoi have successfully utilized MINETEK WATER evaporators on our process water pond to remove mine water and has contributed to help with our water balance. We are currently in the process of moving these units to where the catchment area is larger giving us better utilization of the evaporators.

Tiger Resources Process Superintendent

Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!

Klondex Mines Process Maintenance Planning Manager

MINETEK provide a quality, proven solutions and are established as leading sound attenuation specialists.

Glencore International AG Global HME Category Manager

Good product with great service leads to a great outcome. My dealings with MINETEK WATER and their supply and service of evaporator fans was one of high quality. I installed 10 evaporator fans on climate control to maximise efficiency and the results were incredible. From the first meeting through to commissioning nothing was a problem for the MINETEK WATER team. I would highly recommend this product to anyone with water disposal issues.

Integra Coal Operations Coal Handling & Preparation Plant (CHPP) Manager

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

Northern Goldfields Mining Manager
Industries
Resource Centre​

Solutions

Download