Skip to content
Search
Close this search box.
Nevada Gold Mines
DEEP DOMAIN EXPERIENCE

INTEGRATED WEATHER STATIONS

Fleet of Land Based Evaporators

EXCESS WATER EVAPORATION SOLUTIONS REDUCING RISK & IMPROVING OPERATIONAL EFFICIENCY

Minetek understands the need to manage process and produced water throughout the lifecycle of a mine site to achieve true economic and environmental sustainability. Minetek and has developed a range of water evaporation solutions to help mining operators meet the expectations of their stakeholders.

We have developed the world's most cost-effective mechanical evaporation technology solutions enabling mining leaders to achieve operational excellence in a wide range of challenging operating conditions.

The successful management of water in mining is critical to achieving operational efficiency and environmental compliance. The effective management of water is a critical factor for a mine sites ability to achieve safety, profitability and sustainability objectives. Risks posed by tailings dams, pit flooding, site remediation and contaminate management Significantly impacts mining operations ability to achieve regulatory and environmental compliance.

Minetek's proven mechanical evaporation solutions have helped hundreds of mine sites globally to achieve compliance and meet mine dewatering objectives.

Technical Enquiry

x

Sales Enquiry

x

The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.

Saracen Thunderbox Underground Manager

I can honestly say I have found MINTEK WATER a very professional organisation in all the dealings that I have had with them. They have always been proactive and looked for and suggested alternatives to assist me in the delivery of my projects whilst still working on the original concept.

CS Energy Kogan Creek Power Station Services Superintendent

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

Northern Goldfields Mining Manager

MINETEK have been instrumental in the design of products used on our mining equipment. Our engagement with them is a true business partnership.

Liebherr Australia Mining Manager

After investigating a raft of different methods from sprinkler systems through to desalination systems (too costly for little benefit) we decided on the MINETEK WATER units. The evaporators were easy to install and once activated ran trouble free. We were very happy with the service from MINETEK and the reliability of the system.

OCE Glencore Collinsville Superintendent
Industries
Resource Centre​

Solutions

Download