
Tunneling

TUNNELLING INDUSTRY - UNDERGROUND CIVIL PROJECTS
MINETEK has extensive experience in delivering ventilation solutions in some of the world's most challenging civil tunnelling industries and underground projects. A constant in any major civil infrastructure project is the need to ensure all deliverables meet the required specification and are delivered on time and within budget.
MINETEK has provided innovative fan solutions for a range of tunnelling projects across the globe, ensuring air can be efficiently targeted across the site. With MINETEK's Performance On Demand (POD), operators have the ability to precisely manage pressure and power to optimise airflow circuits.
Our expert design, engineering, manufacturing and project management teams work seamlessly together to ensure each solution meets or exceeds specification and is installed quickly and efficiently to support the challenging tunnel ventilation project deadlines. Lightweight and modular in design, MINETEK's direct-drive tunnel ventilation solutions are ideal for a range of high pressure and flow settings and have been proven to deliver significant cost savings through reduced power consumption.
Technical Enquiry
x
Sales Enquiry
x
Our Capabilities

Primary Ventilation Fans

Secondary Auxiliary Fans

Booster Fans

Multiple Heading Ventilation

Bulkhead Fans

Long Duct Runs

Tunnel Fans

Development Fans

Mine Air Control (Mac)

I can honestly say I have found MINTEK WATER a very professional organisation in all the dealings that I have had with them. They have always been proactive and looked for and suggested alternatives to assist me in the delivery of my projects whilst still working on the original concept.

MINETEK will continue to be a favoured technical resource and supplier to the New Hope Group and are recommended as a professional, respected and competent supplier of technical services, equipment and products for noise abatement and other industrial products.

MINETEK have been instrumental in the design of products used on our mining equipment. Our engagement with them is a true business partnership.

We are always looking at new innovations and technologies that will benefit both us and our clients. Minetek has been able to display that with the use of their modern ventilation technology, where we can look to see production increases through faster re-entry times and reduced capital costs in the total life of the development, delivering value to both us and Mincor.

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.