Menu

SUSTAINING CIVIL PROJECTS
Tunneling

TUNNELLING INDUSTRY - UNDERGROUND CIVIL PROJECTS
MINETEK has extensive experience in delivering ventilation solutions in some of the world's most challenging civil tunnelling industries and underground projects. A constant in any major civil infrastructure project is the need to ensure all deliverables meet the required specification and are delivered on time and within budget.
MINETEK has provided innovative fan solutions for a range of tunnelling projects across the globe, ensuring air can be efficiently targeted across the site. With MINETEK's Performance On Demand (POD), operators have the ability to precisely manage pressure and power to optimise airflow circuits.
Our expert design, engineering, manufacturing and project management teams work seamlessly together to ensure each solution meets or exceeds specification and is installed quickly and efficiently to support the challenging tunnel ventilation project deadlines. Lightweight and modular in design, MINETEK's direct-drive tunnel ventilation solutions are ideal for a range of high pressure and flow settings and have been proven to deliver significant cost savings through reduced power consumption.
Technical Enquiry
x
Sales Enquiry
x
Our Capabilities

Primary Ventilation Fans
MINETEK can supply the largest available fans for main fan ventilation. Innovative engineering and premier quality have resulted in world first features like MINETEK's Performance on Demand (POD) controls. Experience power saving, durability and flexibility not achieved with traditional fans.

Secondary Auxiliary Fans
Keep additional fan installations and mid-project shutdowns to a minimum, with MINETEK's auxiliary fans. Compact in size , while the high pressure capability results in less fans needed for the development. Benefit from automation, syncronisation and control from the surface.

Booster Fans
Strategically optimise underground air flow with MINETEK. Primary fans can be installed as a booster fan for both return and intake airways and provide all the MINETEK advantages. Additionally, MINETEK's fans can sequence with the main ventilation, and anti-stall features, making it a reliable choice for booster ventilation.

Multiple Heading Ventilation
Improve project performance by using MINETEK ventilation solutions for multiple heading ventilation. Reduce operating costs, and decrease work required for installation with MINETEK's high output fans.

Bulkhead Fans
Synchronise bulkhead fans with MINETEK's Performance On Demand (POD) and Mine Air Control (MAC) system. Halve the amount of fans required, and stop inefficient power wastage, stalling and duct friction with MINETEK.

Long Duct Runs
The concentrated power of MINETEK's High Output (HO) Axial Fans, makes them the ideal solution for long duct runs. With more than twice the pressure capacity of a standard bladed axial fan, less fans are needed throughout the development.

Tunnel Fans
MINETEK's low profile fan provides additional clearance between ventilation ducts and loaded vehicles, making them the ideal industrial ventilation solution for tunnels. Improve safety, save power, and achieve maximum performance with MINETEK.

Development Fans
Utilise MINETEK's Pressure, Power, Performance on Demand (POD) system throughout development and reap the economic benefits. Control from the surface, and only use the air pressure and power you need at each stage of the development. MINETEK's fans will grow with your project.

Mine Air Control (Mac)
The Mine Air Control (MAC) system, in conjunction with the fans Performance on Demand (POD) technology enables synchronization of both the primary and secondary ventilation fans to increased performance, economic benefits, and efficient use of power. Control the ventilation system remotely for ideal performance from the surface.

MINETEK initially provided products for heavy mobile equipment noise abatement at the New Acland Mine. These installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.
New Hope Group
Project Superintendent

We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.
Liebherr Australia
Mining Manager

Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!”
Klondex Mines
Process Maintenance Planning Manager

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.
Northern Goldfields
Mining Manager

After investigating a raft of different methods from sprinkler systems through to desalination systems (too costly for little benefit) we decided on the MINETEK WATER units. The evaporators were easy to install and once activated ran trouble free. We were very happy with the service from MINETEK and the reliability of the system.
OCE Glencore Collinsville
Superintendent