SMALLER. STRONGER. SMARTER.CHALLENGING THE STATUS QUO IN UNDERGROUND VENTILATION.
3 KEY TRENDS DRIVING UNDERGROUND VENTILATION INTO THE FUTURE.
EXPLORE OUR FULL RANGE OF HIGH OUTPUT FANS FOR MINING.
Download our latest Air brochure.
Minetek Air is a global industrial mining ventilation solutions provider with decades of experience in helping mining and industry leaders achieve environmentally sustainable underground ventilation management outcomes, enabling safe, reliable and profitable operations. Since 1984, Minetek Air has been delivering innovative, modular air management solutions for underground miners. Our world-class range is proven to deliver increased productivity and reduce operating costs all with the flexibility to control delivery of air when and where it’s needed.
Our Performance On Demand (POD) technology allows operators to tailor pressure and power consumption – without the need for VSD control. With the ability to integrate with all mining Ventilation On Demand (VOD) and mine communication systems, the result is a seamless, responsive solution which optimises performance, reduces power consumption costs and increases overall operational efficiency.
MINETEK FANS ARE DESIGNED TO REDUCE POWER CONSUMPTION COSTS.
![](https://minetek.com/wp-content/uploads/2024/05/Agnew-Stills1074-2-960x960.jpg)
![](https://minetek.com/wp-content/uploads/2024/05/Minetek-Ventilation-Solution-is-Installed-in-an-Underground-Mine-640x203.jpg)
![](https://minetek.com/wp-content/uploads/2024/02/46f51c71de1e76d0b4dc96ad6f7a28f9-640x360.jpg)
Air Capabilities
![primary ventilation fans icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_primary-ventilation-fans.png)
Primary Ventilation Fans
![secondary auxilliary fans icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_secondary-auxilliary-fans.png)
Secondary Auxilliary Fans
![booster fans icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_booster-fans.png)
Booster Fans
![multiple heading ventilation icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_multiple-heading-ventilation.png)
Multiple Heading Ventilation
![bulkhead fans icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_bulkhead-fans.png)
Bulkhead Fans
![long duct runs icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_long-duct-runs.png)
Long Duct Runs
![tunnel fans icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_tunnel-fans.png)
Tunnel Fans
![development fans icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_development-fans.png)
Development Fans
![mine air control (mac) icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_mine-air-control-mac.png)
Mine Air Control (Mac)
VISION. INNOVATION. RESULTS.
FLEXIBILITY. TECHNOLOGY. AGILITY.
1.1 MEGAWATT FAN INSTALLED IN JUST 4 DAYS.
![vision icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_vision.png)
Vision
![innovation icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_innovation.png)
Innovation
![results icon](https://minetek.com/wp-content/uploads/2022/04/cap-icon_results.png)
Results
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
We have utilised MINETEK for a number of sound attenuation projects in the Hunter Valley and have formed an excellent relationship with Glencore over many years. MINETEK understand our industry and always provide a solid and professional commitment to meeting our goals and objectives."
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
MINETEK's installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!”
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.