Mining Site Analysis & application assessment
![Mining Site Analysis Review](https://minetek.com/wp-content/uploads/2022/04/mining-site-analysis-review-640x427.jpeg)
REDUCING PROJECT LEAD TIMES AND DELIVERING ON TARGET OUTCOMES
To ensure the water evaporation solution delivered meets our client's specific needs, our team works collaboratively to review client data and undertake a through mining site analysis review and mining application assessment of the individual setting and needs of the site.
This review process delivers a customised solution designed to meet the specific needs of the site and its stakeholders.
Some of the data our team will request for review includes; historical weather & climate information, water quality data, installation location, proximity to power supply, plume analysis and modelling, Environmental Management System design as well as defining specific operational parameters.
The completion of a thorough mining application assessment enables the Minetek team to streamline the process for delivering an advanced water evaporation solution, reducing project delivery times and ensuring the solution delivers in line with expectation.
Technical Enquiry
x
Sales Enquiry
x
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
We have utilised MINETEK for a number of sound attenuation projects in the Hunter Valley and have formed an excellent relationship with Glencore over many years. MINETEK understand our industry and always provide a solid and professional commitment to meeting our goals and objectives."
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
MINETEK's installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.
![](https://minetek.com/wp-content/uploads/2022/03/quots-1.png)
It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.