Skip to content
Search
Close this search box.
Nevada Gold Mines
MINE WATER MANAGEMENT

PIT DEWATERING

Fleet of Land Based Evaporators

MANAGING MINE WATER IN THE MOST CHALLENGING CONDITIONS

An effective programme to remove excess water in mining processes is vital to enabling operational efficiency all while complying with regulatory requirements.

Removing mine water and managing the quality of stored pit lake water is vital to keeping a mine moving, enabling operators to access recoverable resources and efficiently manage the by-products of the process.

Minetek has extensive experience in delivering water evaporation solutions in the toughest mining conditions; from the most humid, tropical sites where the mine is constantly challenged with removing large quantities of water to arid, desert environments where managing water quality and contaminates is paramount.

With an increased focus on dewatering mines to achieve Zero Liquid Discharge (ZLD), Minetek has developed solutions that cost effectively manage water quantity and quality issues on site.

Technical Enquiry

x

Sales Enquiry

x

MINETEK have been instrumental in the design of products used on our mining equipment. Our engagement with them is a true business partnership.

Liebherr Australia Mining Manager

MINETEK provide a quality, proven solutions and are established as leading sound attenuation specialists.

Glencore International AG Global HME Category Manager

After investigating a raft of different methods from sprinkler systems through to desalination systems (too costly for little benefit) we decided on the MINETEK WATER units. The evaporators were easy to install and once activated ran trouble free. We were very happy with the service from MINETEK and the reliability of the system.

OCE Glencore Collinsville Superintendent

MINETEK will continue to be a favoured technical resource and supplier to the New Hope Group and are recommended as a professional, respected and competent supplier of technical services, equipment and products for noise abatement and other industrial products.

New Hope Group Project Superintendent

The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.

Saracen Thunderbox Underground Manager
Industries
Resource Centre​

Solutions

Download