Evaporation Efficiency modelling

PRECISION OUTCOMES DELIVERED THROUGH PROPRIETARY MODELLING

Minetek undertakes specific evaporation efficiency modelling for each client we work with. This is based on weather data inputs such as rainfall, elevation, wind, humidity and temperature, and ensures the water evaporation system we develop precisely meets our clients operational and strategic objectives.

The said water evaporation efficiency modelling enables us to understand the evaporation rates we will be able to achieve over a 12-month period in the target climate. Based on the outcome of the modeling and the volume of water needed to be evaporated, we can then design a water evaporation design and engineering system accordingly.

Minetek is able to perform this modelling complimentary for all our clients globally through the use of our proprietary modelling program that was developed in conjunction with a leading university.

Minetek’s evaporation efficiency modelling has been independently verified by our clients & consultants.

water evaporation design and engineering

Technical Enquiry

x

Sales Enquiry

x

We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.

Liebherr Australia Mining Manager

I can honestly say I have found MINTEK WATER a very professional organisation in all the dealings that I have had with them. They have always been proactive and looked for and suggested alternatives to assist me in the delivery of my projects whilst still working on the original concept.

CS Energy Kogan Creek Power Station Services Superintendent

MINETEK initially provided products for heavy mobile equipment noise abatement at the New Acland Mine. These installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group Project Superintendent

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

Northern Goldfields Mining Manager

MINETEK provide a quality, proven solutions and are established as leading sound attenuation specialists.