Evaporation Efficiency modelling

PRECISION OUTCOMES DELIVERED THROUGH PROPRIETARY MODELLING

Minetek undertakes specific evaporation efficiency modelling for each client we work with. This is based on weather data inputs such as rainfall, elevation, wind, humidity and temperature, and ensures the water evaporation system we develop precisely meets our clients operational and strategic objectives.

The said water evaporation efficiency modelling enables us to understand the evaporation rates we will be able to achieve over a 12-month period in the target climate. Based on the outcome of the modeling and the volume of water needed to be evaporated, we can then design a water evaporation design and engineering system accordingly.

Minetek is able to perform this modelling complimentary for all our clients globally through the use of our proprietary modelling program that was developed in conjunction with a leading university.

Minetek’s evaporation efficiency modelling has been independently verified by our clients & consultants.

water evaporation design and engineering

Technical Enquiry

x

Sales Enquiry

x

Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!

Klondex Mines Process Maintenance Planning Manager

The ability to deliver equipment on time has been a feature of our dealing and we haven't had a situation where a variation has been requested. The quality of their workmanship has been good and the capability of hardware has been as expected or better than quoted”

CS Energy Kogan Creek Power Station Services Superintendent

MINETEK provide a quality, proven solutions and are established as leading sound attenuation specialists.

Glencore International AG Global HME Category Manager

Kipoi have successfully utilized MINETEK WATER evaporators on our process water pond to remove mine water and has contributed to help with our water balance. We are currently in the process of moving these units to where the catchment area is larger giving us better utilization of the evaporators.

Tiger Resources Process Superintendent

We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.

Liebherr Australia Mining Manager