Demonstrated Results

PLUME MODELLING & ANALYSIS

In all Mining applications, from hard rock to soft metals, in both underground and above-surface operations, MINETEK WATER has built a name delivering leading water evaporation and water management solutions.

Technical Enquiry

x

Sales Enquiry

x

Good product with great service leads to a great outcome. My dealings with MINETEK WATER and their supply and service of evaporator fans was one of high quality. I installed 10 evaporator fans on climate control to maximise efficiency and the results were incredible. From the first meeting through to commissioning nothing was a problem for the MINETEK WATER team. I would highly recommend this product to anyone with water disposal issues.

Integra Coal Operations Coal Handling & Preparation Plant (CHPP) Manager

The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.

Saracen Thunderbox Underground Manager

We are always looking at new innovations and technologies that will benefit both us and our clients. Minetek has been able to display that with the use of their modern ventilation technology, where we can look to see production increases through faster re-entry times and reduced capital costs in the total life of the development, delivering value to both us and Mincor.

Pit N Portal CEO

MINETEK initially provided products for heavy mobile equipment noise abatement at the New Acland Mine. These installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group Project Superintendent

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

Northern Goldfields Mining Manager
Industries
Resource Centre​

Solutions

Download