Skip to content

MODEL 600/300 LAND BASED EVAPORATOR

Designed to handle evaporation for large areas of operation, our Model 600/300 Land Based Evaporator can facilitate large-scale evaporation processes with its reliable technology and heavy-duty construction. See the product details below.

  • 90kw (120HP) Electric Motor
  • 135m 3 /hour, (600 GPM) Water Flow Rate
  • 37.5 litres/second / 2,250 litres/minute / 135,000 litres/hour / 3,240,000 litres per 24-hour day
  • 10 bar (145 PSI) Pressure Requirement
  • Stainless Steel Welded Parts
  • Globally Patented Technology
  • Mobile Skid Mounted Unit
  • Heavy-Duty Construction Options:
    – Hot dipped Galvanised Steel
    - Epoxy Coated Steel
    – 316 Stainless Steel
MINETEK 600/300 Land Based Evaporator

MODEL SPECIFICATIONS

Designed to handle evaporation for large areas of operation, our Model 600/300 Land Based Evaporator can facilitate large-scale evaporation processes with its reliable technology and heavy-duty construction. See the product details below.

  • 90kw (120HP) Electric Motor
  • 135m 3 /hour (600 GPM) Water Flow Rate
  • 10 bar (145 PSI) Pressure Requirement
  • Stainless Steel Wetted Parts
  • Globally Patented Technology
  • Mobile Skid Mounted Unit
  • Heavy-Duty Construction Options:
  • – Hot dipped Galvanised Steel

    – Epoxy Coated Steel

    – 316 Stainless Steel

Technical Enquiry

x

Sales Enquiry

x

MINETEK will continue to be a favoured technical resource and supplier to the New Hope Group and are recommended as a professional, respected and competent supplier of technical services, equipment and products for noise abatement and other industrial products.

New Hope Group Project Superintendent

MINETEK understand our business, and our requirements, and always display a solid commitment to meeting our goals. We enjoy an open and honest business relationship, and we consider ours to be a lifelong partnership.

Liebherr Australia Mining Manager

MINETEK's installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group Project Superintendent

The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.

Saracen Thunderbox Underground Manager

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

Northern Goldfields Mining Manager
Industries
Resource Centre​

Solutions

Download