Skip to content
Search
Close this search box.

MODEL 200E FLOATING EVAPORATION SYSTEM

200e minetek floating evaporator

MODEL SPECIFICATIONS

Floating evaporators are excellent at evaporation even through harsher wind conditions. You can trust Minetek Water's Model 200E Floating Evaporation System for your mine water treatment requirements. See the product details below.

  • Twin 100/50 Evaporators Back-to-Back
  • Heavy Duty Construction
  • 6 L/sec (95 GPM) Per Unit, Total Flow Rate of 12 L/Sec (190 GPM)
  • 7.5kW (10 HP) Motor Per Unit, Total of 15kw (20 HP)
  • 18.5kW (25 HP) Submersible Pump to Provide Total 12L/s @ 10 bar (145 PSI)
  • Heavy Duty Pontoon Structure with Floats & Pipework

Technical Enquiry

x

Sales Enquiry

x

The ability to deliver equipment on time has been a feature of our dealing and we haven't had a situation where a variation has been requested. The quality of their workmanship has been good and the capability of hardware has been as expected or better than quoted”

CS Energy Kogan Creek Power Station Services Superintendent

MINETEK provide a quality, proven solutions and are established as leading sound attenuation specialists.

Glencore International AG Global HME Category Manager

I have used these evaporators very successfully at mine sites where I have worked in the past. They are an extremely reliable unit and worked above expectations in the environment where we had them set up. As for spray drift/mist this can be controlled by the weather monitoring systems that are available with the units. Additionally, how you set them up and the amount of fall you can achieve allows for more moisture to be stripped from the droplets]will greatly benefit your overall evaporation rates.

Rolleston Coal Operations Manager

MINETEK will continue to be a favoured technical resource and supplier to the New Hope Group and are recommended as a professional, respected and competent supplier of technical services, equipment and products for noise abatement and other industrial products.

New Hope Group Project Superintendent

Kipoi have successfully utilized MINETEK WATER evaporators on our process water pond to remove mine water and has contributed to help with our water balance. We are currently in the process of moving these units to where the catchment area is larger giving us better utilization of the evaporators.

Tiger Resources Process Superintendent
Industries
Resource Centre​

Solutions

Download