Skip to content
[gtranslate]

Freight and Logistics to Site

MINETEK Water Evaporation Systems can be supplied as a turnkey package, delivered via freight and logistics to site when ready for installation.

MINETEK Water Evaporation Systems can be supplied as a turnkey package, delivered to site ready for installation.

For a turnkey system project, MINETEK would supply the following scope:

  • QTY x MINETEK Evaporators
  • Electrical Control Board MCC
  • Pumping System
  • Poly Pipe Package
  • Electrical and Control Cable Package
  • Design and Engineering Package
  • Freight and Logistics to Site
  • Automation Control Package (EMS) and Weather Station
  • Commissioning and Training
Weather Station

Technical Enquiry

x

Sales Enquiry

x

Good product with great service leads to a great outcome. My dealings with MINETEK WATER and their supply and service of evaporator fans was one of high quality. I installed 10 evaporator fans on climate control to maximise efficiency and the results were incredible. From the first meeting through to commissioning nothing was a problem for the MINETEK WATER team. I would highly recommend this product to anyone with water disposal issues.

Integra Coal Operations Coal Handling & Preparation Plant (CHPP) Manager

I have used these evaporators very successfully at mine sites where I have worked in the past. They are an extremely reliable unit and worked above expectations in the environment where we had them set up. As for spray drift/mist this can be controlled by the weather monitoring systems that are available with the units. Additionally, how you set them up and the amount of fall you can achieve allows for more moisture to be stripped from the droplets]will greatly benefit your overall evaporation rates.

Rolleston Coal Operations Manager

We are always looking at new innovations and technologies that will benefit both us and our clients. Minetek has been able to display that with the use of their modern ventilation technology, where we can look to see production increases through faster re-entry times and reduced capital costs in the total life of the development, delivering value to both us and Mincor.

Pit N Portal CEO

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

Northern Goldfields Mining Manager

MINETEK initially provided products for heavy mobile equipment noise abatement at the New Acland Mine. These installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group Project Superintendent
Industries
Resource Centre​

Solutions

Download