Skip to content
Search
Close this search box.

DUAL EVAPORATOR SKID MOBILE EVAPORATOR SYSTEMS

MODEL SPECIFICATIONS

  • 2 x 600/300, 400/200 or 200/100 Evaporator Units
  • 1 x Purpose-Built Booster Supply Pump
  • 1 x Central Electrical Control Board (MCC)
  • 1 x 40- Heavy Duty Skid
  • Interconnecting Electrical Cable and Pipework
  • Globally-Patented Technology
  • Heavy-Duty Construction Options:
  • – Hot-Dipped Galvanised Steel

    – Epoxy Coated Steel

    – 316 Stainless Steel

Evaporator

Technical Enquiry

x

Sales Enquiry

x

MINETEK's installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group Project Superintendent

Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!

Klondex Mines Process Maintenance Planning Manager

The ability to deliver equipment on time has been a feature of our dealing and we haven't had a situation where a variation has been requested. The quality of their workmanship has been good and the capability of hardware has been as expected or better than quoted”

CS Energy Kogan Creek Power Station Services Superintendent

MINETEK have been instrumental in the design of products used on our mining equipment. Our engagement with them is a true business partnership.

Liebherr Australia Mining Manager

Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!”

Klondex Mines Process Maintenance Planning Manager
Industries
Resource Centre​

Solutions

Download