Skip to content

DUAL EVAPORATOR SKID MOBILE EVAPORATOR SYSTEMS

MODEL SPECIFICATIONS

  • 2 x 600/300, 400/200 or 200/100 Evaporator Units
  • 1 x Purpose-Built Booster Supply Pump
  • 1 x Central Electrical Control Board (MCC)
  • 1 x 40- Heavy Duty Skid
  • Interconnecting Electrical Cable and Pipework
  • Globally-Patented Technology
  • Heavy-Duty Construction Options:
  • – Hot-Dipped Galvanised Steel

    – Epoxy Coated Steel

    – 316 Stainless Steel

Evaporator

Technical Enquiry

x

Sales Enquiry

x

The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.

Saracen Thunderbox Underground Manager

After investigating a raft of different methods from sprinkler systems through to desalination systems (too costly for little benefit) we decided on the MINETEK WATER units. The evaporators were easy to install and once activated ran trouble free. We were very happy with the service from MINETEK and the reliability of the system.

OCE Glencore Collinsville Superintendent

I can honestly say I have found MINTEK WATER a very professional organisation in all the dealings that I have had with them. They have always been proactive and looked for and suggested alternatives to assist me in the delivery of my projects whilst still working on the original concept.

CS Energy Kogan Creek Power Station Services Superintendent

MINETEK will continue to be a favoured technical resource and supplier to the New Hope Group and are recommended as a professional, respected and competent supplier of technical services, equipment and products for noise abatement and other industrial products.

New Hope Group Project Superintendent

Kipoi have successfully utilized MINETEK WATER evaporators on our process water pond to remove mine water and has contributed to help with our water balance. We are currently in the process of moving these units to where the catchment area is larger giving us better utilization of the evaporators.

Tiger Resources Process Superintendent
Industries
Resource Centre​

Solutions

Download