Skip to content
Search
Close this search box.

High Output (HO) 1100 kW Axial Fan

High Output Axial Fan for Mines

HIGH OUTPUT (H.O) 1100 KW AXIAL FAN PRODUCT INFORMATION

The Minetek High Output HO 1100 kW Axial Fan is the only fan available in the market that offers this level of advanced technology and engineering in this large size.

Specifications
ModelHO-Y-1100
Fan SeriesHigh Output (HO)
Impeller MaterialSteel Bladed
Size (mm)2650
kW1100
RPM750
Max. Airflow (m3/s)278
Max. Static Pressure (pa)5140
Features as StandardAnti-stall Chamber and POD Technology
Watch this fan being installed in 4 days

Technical Enquiry

x

Sales Enquiry

x

We have utilised MINETEK for a number of sound attenuation projects in the Hunter Valley and have formed an excellent relationship with Glencore over many years. MINETEK understand our industry and always provide a solid and professional commitment to meeting our goals and objectives."

Glencore International AG Global HME Category Manager

We found the MINETEK WATER team listened and supported our situation with helpful guidance and advice to layout the evaporator pipework maximising their efficiency. I would highly recommend the units to others needing a cost effective solution to excess water.”

Osborne Gold Mine Superintendent Environment

MINETEK have been instrumental in the design of products used on our mining equipment. Our engagement with them is a true business partnership.

Liebherr Australia Mining Manager

MINETEK will continue to be a favoured technical resource and supplier to the New Hope Group and are recommended as a professional, respected and competent supplier of technical services, equipment and products for noise abatement and other industrial products.

New Hope Group Project Superintendent

We are always looking at new innovations and technologies that will benefit both us and our clients. Minetek has been able to display that with the use of their modern ventilation technology, where we can look to see production increases through faster re-entry times and reduced capital costs in the total life of the development, delivering value to both us and Mincor.

Pit N Portal CEO
Industries
Resource Centre​

Solutions

Download