Skip to content
[gtranslate]
SPECIALIST INVENTORY

Parts and Accessories

ufp0021

THE PARTS AND EXPERTISE TO KEEP INDUSTRIES MOVING.

Having access to the right part at the right time is critical in keeping your plant on the move. MINETEK stocks a wide range of replacement parts and accessories to ensure your operations can quickly respond to failures and breakdowns, reducing the potential impacts of costly downtime.

Access to a dedicated inventory of repair and replacement of parts and accessories offers peace of mind as well as enables industry leaders to maintain continuity of operations. With our expert team standing behind every replacement part, you can focus on maintaining operations and availability at the highest possible.

MINETEK maintains stocks of critical OEM and replacement parts in strategic locations close to our clients' operations to ensure we have the right part at the right time to keep your machines on the move.

Technical Enquiry

x

Sales Enquiry

x


Warning: Undefined array key 1 in /home/minetekc/public_html/wp-content/plugins/minetek-codes/snippets/shortcode_cta-capability.php on line 185

OUR PRODUCTS

exhaust clamps icon

Exhaust Clamps

Explore our range of stepped, flat band and standard U-bolt clamps.
VIEW MORE
mandrel bends icon

Mandrel Bends

We stock a large range of mild steel mandrel bends for any exhaust application.
VIEW MORE
thermal heat tape icon

Thermal Heat Tape

Manage heat effectively with our fiberglass heat tape in 2” to 6” rolls.
VIEW MORE
tubing icon

Tubing

Both mild and stainless steel, flexible and straight tubing options available.
VIEW MORE

The ability to deliver equipment on time has been a feature of our dealing and we haven't had a situation where a variation has been requested. The quality of their workmanship has been good and the capability of hardware has been as expected or better than quoted”

CS Energy Kogan Creek Power Station Services Superintendent

Kipoi have successfully utilized MINETEK WATER evaporators on our process water pond to remove mine water and has contributed to help with our water balance. We are currently in the process of moving these units to where the catchment area is larger giving us better utilization of the evaporators.

Tiger Resources Process Superintendent

The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.

Saracen Thunderbox Underground Manager

MINETEK initially provided products for heavy mobile equipment noise abatement at the New Acland Mine. These installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group Project Superintendent

Our evaporators are still performing flawlessly and working absolutely great. They have been running 24/7 without a single hiccup. Thanks again!”

Klondex Mines Process Maintenance Planning Manager
Industries
Resource Centre​

Solutions

Download