Minetek power electrical projects
TURN KEY

ELECTRICAL PROJECTS

As a leading provider of end-to-end electrical and control solutions, we are committed to delivering safe, compliant, and profitable operations for the future.

At Minetek, we understand the unique challenges industrial and mining operations face. With our extensive experience and expertise, we offer integrated solutions that cover every aspect of your electrical and control needs. From strategic consultation and design development to project management and commissioning, our highly trained team of electrical engineers, designers, operators, and managers ensures that each project meets the highest regulatory compliance standards and operational excellence.

Our comprehensive range of services spans across various industries, including mining, commercial, materials processing, and defence. We pride ourselves on delivering innovative engineering and technology solutions that drive efficiency and productivity. Whether you require motor starter ancillaries, complete distribution systems, switchrooms, substations, or specialised equipment such as pump starters and fan starters, Minetek Power has the expertise and resources to provide tailored power solutions for even the most challenging environments.

Minetek power projects electrical mining

Electrical projects & case studies

Customer satisfaction is at the heart of everything we do. We combine our commitment to quality with exceptional customer service, ensuring that your experience with Minetek is nothing short of exceptional. Our dedicated team works closely with you to understand your unique requirements and deliver customised solutions that meet your specific needs.

Discover the Minetek Power advantage and unlock the potential of your industrial and mining operations. Explore our latest projects and experience the difference of working with a trusted industry leader.

Download brochure
wingecarribee council project

Case study - NSW Government

Company – NSW Government - Wingecarribee Shire Council
Site name – Resource Recovery Centre
Location – Moss Vale, NSW Australia
Power products – Dual Pump and Fan MCC
Scope – DOL starter for 2 x 3.7kw pump motors and 2 x 1.5kw fan motors. Heavy duty skid and canopy. On site installation and commissioning.
Completion – Feb 2023, Approx. 8 week lead time.

Agnew mine underground electrical Dual 1.1MW Fan MCC

Case study - Agnew Gold Mine

Company – Gold Fields
Site name – Agnew Mine
Location – Leinster, WA Australia
Power products – Dual 1.1MW Fan MCC
Scope – Design, manufacture and commission a custom MCC to power 2 x 1100KW Primary Fans. The MCC included Automation.
Completion – 2019

Case study - Thuderbox Mine

Company – Northern Star Resources Limited
Site name – Thunderbox Mine
Location – Leinster, WA Australia
Power products – Dual 375KW Fan MCC, 250KW Containerised Fan Starter
Scope – Design, manufacture and commission a dual 375KW Fan MCC and Containerised 250KW Fan starter for primary ventilation upgrade. Starters included soft starters and automation.
Completion – 2022

Case study - Tritton Mine

Company – Aeris Resources
Site name – Tritton Copper Operations
Location – Hermindale, NSW Australia
Power products – 250KW Fan Starter.
Scope – Supply and commissioning of a 250KW fan starter for a development fan. It included a soft starter and automation.
Completion – 2022

6 x 90KW Fan & 2 x 250KW Pump MCC

Case Study - Queensland Government

Company – Queensland Government Site name – Mount Morgan Location – Mount Morgan, QLD Australia
Power products – Diesel Generator, 1 90KW Fan, 1 x 75KW Pump
Scope – Minetek supplied a custom MCC and generator as part of an evaporator system. Powered by the MCC was 1 x 90KW Fan Motor and 1 x 75KW Pump. Automation was included.
Completion – 2023

Case study - Golden Grove Mine

Company – 29 Metals Site name – Golden Grove
Location – Yalgoo, WA Australia
Power products – Dual 560KW Fan MCC
Scope – Minetek designed, manufactured and commissioned a custom MCC to power 2 x 560KW Primary Booster Fans. The MCC included automation and provision for remote monitoring/ operation.
Completion – 2022

Diesel Generator, 1 90KW Fan, 1 x 75KW Pump Power

Case study - Mount Rawdon

Company – Evolution Mining
Site name – Mount Rawdon Gold Mine
Location – Mount Perry, QLD Australia
Power products – 6 x 90KW Fan & 2 x 250KW Pump MCC
Scope – Minetek designed and manufactured a custom MCC as part of an evaporator system. Powered by the MCC was 6 x 90KW Fan motors and 2 x 250KW Pump motors which required soft start. Automation was also included.
Completion – 2022

Technical Enquiry

x

Sales Enquiry

x

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

Northern Goldfields Mining Manager

We are always looking at new innovations and technologies that will benefit both us and our clients. Minetek has been able to display that with the use of their modern ventilation technology, where we can look to see production increases through faster re-entry times and reduced capital costs in the total life of the development, delivering value to both us and Mincor.

Pit N Portal CEO

After investigating a raft of different methods from sprinkler systems through to desalination systems (too costly for little benefit) we decided on the MINETEK WATER units. The evaporators were easy to install and once activated ran trouble free. We were very happy with the service from MINETEK and the reliability of the system.

OCE Glencore Collinsville Superintendent

MINETEK have been instrumental in the design of products used on our mining equipment. Our engagement with them is a true business partnership.

Liebherr Australia Mining Manager

MINETEK provide a quality, proven solutions and are established as leading sound attenuation specialists.