ELECTRICAL PROJECTS
As a leading provider of end-to-end electrical and control solutions, we are committed to delivering safe, compliant, and profitable operations for the future.
At Minetek, we understand the unique challenges industrial and mining operations face. With our extensive experience and expertise, we offer integrated solutions that cover every aspect of your electrical and control needs. From strategic consultation and design development to project management and commissioning, our highly trained team of electrical engineers, designers, operators, and managers ensures that each project meets the highest regulatory compliance standards and operational excellence.
Our comprehensive range of services spans across various industries, including mining, commercial, materials processing, and defence. We pride ourselves on delivering innovative engineering and technology solutions that drive efficiency and productivity. Whether you require motor starter ancillaries, complete distribution systems, switchrooms, substations, or specialised equipment such as pump starters and fan starters, Minetek Power has the expertise and resources to provide tailored power solutions for even the most challenging environments.
Electrical projects & case studies
Customer satisfaction is at the heart of everything we do. We combine our commitment to quality with exceptional customer service, ensuring that your experience with Minetek is nothing short of exceptional. Our dedicated team works closely with you to understand your unique requirements and deliver customised solutions that meet your specific needs.
Discover the Minetek Power advantage and unlock the potential of your industrial and mining operations. Explore our latest projects and experience the difference of working with a trusted industry leader.
Case study - NSW Government
Company – NSW Government - Wingecarribee Shire Council
Site name – Resource Recovery Centre
Location – Moss Vale, NSW Australia
Power products – Dual Pump and Fan MCC
Scope – DOL starter for 2 x 3.7kw pump motors and 2 x 1.5kw fan motors. Heavy duty skid and canopy. On site installation and commissioning.
Completion – Feb 2023, Approx. 8 week lead time.
Case study - Agnew Gold Mine
Company – Gold Fields
Site name – Agnew Mine
Location – Leinster, WA Australia
Power products – Dual 1.1MW Fan MCC
Scope – Design, manufacture and commission a custom MCC to power 2 x 1100KW Primary Fans. The MCC included Automation.
Completion – 2019
Case study - Thuderbox Mine
Company – Northern Star Resources Limited
Site name – Thunderbox Mine
Location – Leinster, WA Australia
Power products – Dual 375KW Fan MCC, 250KW Containerised Fan Starter
Scope – Design, manufacture and commission a dual 375KW Fan MCC and Containerised 250KW Fan starter for primary ventilation upgrade. Starters included soft starters and automation.
Completion – 2022
Case study - Tritton Mine
Company – Aeris Resources
Site name – Tritton Copper Operations
Location – Hermindale, NSW Australia
Power products – 250KW Fan Starter.
Scope – Supply and commissioning of a 250KW fan starter for a development fan. It included a soft starter and automation.
Completion – 2022
Case Study - Queensland Government
Company – Queensland Government
Site name – Mount Morgan
Location – Mount Morgan, QLD Australia
Power products – Diesel Generator, 1 90KW Fan, 1 x 75KW Pump
Scope – Minetek supplied a custom MCC and generator as part of an evaporator system. Powered by the MCC was 1 x 90KW Fan Motor and 1 x 75KW Pump. Automation was included.
Completion – 2023
Case study - Golden Grove Mine
Company – 29 Metals
Site name – Golden Grove
Location – Yalgoo, WA Australia
Power products – Dual 560KW Fan MCC
Scope – Minetek designed, manufactured and commissioned a custom MCC to power 2 x 560KW Primary Booster Fans. The MCC included automation and provision for remote monitoring/ operation.
Completion – 2022
Case study - Mount Rawdon
Company – Evolution Mining
Site name – Mount Rawdon Gold Mine
Location – Mount Perry, QLD Australia
Power products – 6 x 90KW Fan & 2 x 250KW Pump MCC
Scope – Minetek designed and manufactured a custom MCC as part of an evaporator system. Powered by the MCC was 6 x 90KW Fan motors and 2 x 250KW Pump motors which required soft start. Automation was also included.
Completion – 2022
Case Study - Agnew Mine
Details:
Located 30km from Leinster in Western Australia is Gold Fields Agnew Mine. This site houses the Waroonga and New Holland underground mines, the last two remaining gold mines in the Goldfields region. Both mines have been operational since the 1880s and have seen a resurgence in production over the past decade, producing 233,300oz of gold in 2020.
Challenge:
The recent resurgence in production required Agnew mine to complete a ventilation upgrade to meet Life Of Mine (LOM) requirements for continued production, mine extensions and brownfield exploration in under-explored sections of the tenements.
Solution & results:
Agnew’s decision to choose Minetek for their power solutions allowed for easy coordination of both the ventilation upgrade & the site’s power solutions, ensuring that all of Agnew’s requirements were holistically met with less down time.
Technical Enquiry
x
Sales Enquiry
x
MINETEK will continue to be a favoured technical resource and supplier to the New Hope Group and are recommended as a professional, respected and competent supplier of technical services, equipment and products for noise abatement and other industrial products.
We have utilised MINETEK for a number of sound attenuation projects in the Hunter Valley and have formed an excellent relationship with Glencore over many years. MINETEK understand our industry and always provide a solid and professional commitment to meeting our goals and objectives."
We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.
The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely... and allows us to scale our ventilation flow with their pressure on demand system to suit our production profile.
MINETEK understand our business, and our requirements, and always display a solid commitment to meeting our goals. We enjoy an open and honest business relationship, and we consider ours to be a lifelong partnership.