Skip to content

Tiger Resources

Kipoi have successfully utilized MINETEK WATER evaporators on our process water pond to remove mine water and has contributed to help with our water balance. We are currently in the process of moving these units to where the catchment area is larger giving us better utilization of the evaporators.

Saracen Thunderbox

The relatively small fans allowed us to utilise our existing bulkhead, where we were severely limited by space, which allowed us to use our existing infrastructure and dramatically reduce downtime in the mine during the change out. The installation was completed safely… and allows us to scale our ventilation flow with their pressure on demand […]

Rolleston Coal

I have used these evaporators very successfully at mine sites where I have worked in the past. They are an extremely reliable unit and worked above expectations in the environment where we had them set up. As for spray drift/mist this can be controlled by the weather monitoring systems that are available with the units. […]

Pit N Portal

We are always looking at new innovations and technologies that will benefit both us and our clients. Minetek has been able to display that with the use of their modern ventilation technology, where we can look to see production increases through faster re-entry times and reduced capital costs in the total life of the development, […]

Osborne Gold Mine

We found the MINETEK WATER team listened and supported our situation with helpful guidance and advice to layout the evaporator pipework maximising their efficiency. I would highly recommend the units to others needing a cost effective solution to excess water.”

OCE Glencore Collinsville

After investigating a raft of different methods from sprinkler systems through to desalination systems (too costly for little benefit) we decided on the MINETEK WATER units. The evaporators were easy to install and once activated ran trouble free. We were very happy with the service from MINETEK and the reliability of the system.

Northern Goldfields

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

New Hope Group

MINETEK initially provided products for heavy mobile equipment noise abatement at the New Acland Mine. These installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group

MINETEK’s installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group

MINETEK will continue to be a favoured technical resource and supplier to the New Hope Group and are recommended as a professional, respected and competent supplier of technical services, equipment and products for noise abatement and other industrial products.

Industries
Resource Centre​

Solutions

Download