Dewatering solution for a Guinea gold mine tailings dam
This gold mine, located in Koromandougou, Guinea, required an effective solution for managing their tailings dam. To address this need, Minetek provided a a Mechanical Water Evaporation system capable of handling a volume throughput of 405 m³/hour (1,800 GPM). The scope of the project included the manufacture and commissioning of this advanced system. Minetek’s innovative solution has enabled the mine to manage its tailings dam, ensuring optimal water levels and operational efficiency.
Localisation - Koromandougou, Guinea
Industrie - Exploitation minière
Application - Tailings dam management
Produit - 600/300 Mechanical Evaporation systems
Débit volumétrique - 405 m3/hour (1,800 GPM)
Scope – Manufacture and commissioning