Dewatering solution for a Guinea gold mine presa de estériles
This gold mine, located in Koromandougou, Guinea, required an effective solution for managing their tailings dam. To address this need, Minetek provided a a Mechanical Water Evaporation system capable of handling a volume throughput of 405 m³/hour (1,800 GPM). The scope of the project included the manufacture and commissioning of this advanced system. Minetek’s innovative solution has enabled the mine to manage its tailings dam, ensuring optimal water levels and operational efficiency.
Ubicación - Koromandougou, Guinea
Industria - Minería
Aplicación - Gestión de presas de residuos
Producto - 600/300 Mechanical Evaporation systems
Volumen de producción - 405 m3/hora (1.800 GPM)
Ámbito - Fabricación y puesta en servicio