Vai al contenuto principale
Contatto
Torna ai casi di studio

Koromandougou, Guinea Gold Mine – Water Evaporation Solution

Dewatering solution for a Guinea gold mine tailings dam

This gold mine, located in Koromandougou, Guinea, required an effective solution for managing their tailings dam. To address this need, Minetek provided a a Mechanical Water Evaporation system capable of handling a volume throughput of 405 m³/hour (1,800 GPM). The scope of the project included the manufacture and commissioning of this advanced system. Minetek’s innovative solution has enabled the mine to manage its tailings dam, ensuring optimal water levels and operational efficiency.

Posizione - Koromandougou, Guinea 
Industria - Miniere
Applicazione - Tailings dam management
Prodotto - 600/300 Mechanical Evaporation systems
Volume di produzione - 405 m3/hour (1,800 GPM)
Scope – Manufacture and commissioning