Dewatering solution for Gold Mine in Australia
Minetek Water implemented a specialised tailings dam management solution for a gold mining operation in Queensland, Australia. The project featured a three 600/300 Evaporation System Package, specifically designed to handle the site’s water management needs within the tailings dam. With a total volume throughput of 405 cubic meters per hour (1,800 gallons per minute), the systems effectively reduced water levels, enhancing site safety and operational efficiency.
Posizione - Queensland, Australia
Industria - Miniere d'oro
Applicazione - Gestione della diga sugli sterili
Prodotto - 3 x 600/300 Evaporation System Package
Volume di produzione - 405 m3/ora (1.800 GPM)
SOLUZIONI PER L'ACQUA
Prodotti correlati
Casi di studio