Dewatering solution for Gold Mine in Australia
Minetek Water implemented a specialised tailings dam management solution for a gold mining operation in Queensland, Australia. The project featured a three 600/300 Evaporation System Package, specifically designed to handle the site’s water management needs within the tailings dam. With a total volume throughput of 405 cubic meters per hour (1,800 gallons per minute), the systems effectively reduced water levels, enhancing site safety and operational efficiency.
Ubicación - Queensland, Australia
Industria - Minería de oro
Aplicación - Gestión de presas de residuos
Producto - Paquete de 3 sistemas de evaporación 600/300
Volumen de producción - 405 m3/hora (1.800 GPM)
SOLUCIONES PARA EL AGUA
Productos relacionados
Casos prácticos