Dewatering solution for Gold Mine in Australia
Minetek Water implemented a specialised tailings dam management solution for a gold mining operation in Queensland, Australia. The project featured a three 600/300 Evaporation System Package, specifically designed to handle the site’s water management needs within the tailings dam. With a total volume throughput of 405 cubic meters per hour (1,800 gallons per minute), the systems effectively reduced water levels, enhancing site safety and operational efficiency.
Lokasi - Queensland, Australia
Industri - Penambangan Emas
Aplikasi - Pengelolaan Bendungan Tailing
Produk - 3 x 600/300 Evaporation System Package
Keluaran volume - 405 m3/jam (1.800 GPM)
LARUTAN AIR
Produk terkait
Studi Kasus