Skip to main content
Contact Us
Return to downloads

Water | Viper Coal Mine case study

  • Water
  • Case Study
  • North America

Viper Mine’s tailings storage facility is at capacity reaching the end of its useful life after 39 years, and Knight Hawk Coal commissioned Minetek to assist with the dewatering and reclamation of this storage facility.

The entire 270-acre storage facility requires dewatering before reclamation can begin, with around 140 million
gallons of water to be removed.

The goal for Knight Hawk Coal’s Viper Mine is to be a zero-discharge facility ensuring environmental compliance.

Get your free copy

Learn how we've kept mines on the move for more than 40 years.