Skip to main content
Nous contacter
Retour aux études de cas

Kambalda Nickel Mine – Primary Ventilation Fan

Optimisation de la durée de vie de la mine exigences en matière de ventilation

Minetek successfully delivered an innovative ventilation solution to this Kambalda Nickel Mine in Western Australia. This project involved the design, manufacture, and installation of advanced primary ventilation fans tailored to meet the specific needs of the underground mine. The solution not only enhances airflow efficiency but also ensures compliance with stringent regulatory standards. Minetek’s robust and reliable ventilation systems are designed to withstand the challenging conditions of the mining environment, ultimately contributing to improved safety and productivity. This collaboration underscores Minetek’s commitment to providing customised, high-performance solutions for the mining industry.

Industrie - Australie occidentale
Mine type – Sous terre
Mineral – Nickle
Localisation - Kambalda, Western Australia, Australia
Industrie - Exploitation minière
Product/Scope – Primary HO Ventilation Fan

Ventilateur

Minetek HO Modèle S

Devoirs

350 m3 / s à 4 800 Pa.

Résultat

Possibilité de modifier le fonctionnement du ventilateur en fonction de l'évolution de la mine. La technologie Performance On Demand (POD) réduit la consommation d'énergie et diminue les coûts énergétiques.

Efficient ventilation solutions

Fourniture d'une solution de ventilation primaire interne pouvant être réutilisée dans le système secondaire.

  • Solution personnalisée s'adaptant à la chambre de ventilation existante, ce qui permet d'économiser de l'argent et du temps lors de l'extension de l'infrastructure.
  • La conception modulaire a permis au personnel sur place de mener à bien l'installation avec l'aide du site Minetek.
  • La régulation de l'air a permis à la mine d'augmenter la ventilation en fonction de l'augmentation de la production, ce qui a permis de réduire la consommation d'énergie de l'exploitation.
TESTIMONIALES

Ce que nos clients ont à dire...

We are always looking at new innovations and technologies that will benefit both us and our clients. Minetek has been able to display that with the use of their modern ventilation technology, where we can look to see production increases through faster re-entry times and reduced capital costs in the total life of the development, delivering value to both us and our client.

Client

From the start of early discussions with the clients, it was very evident that both parties wanted to deliver the maximum amount of value for their stakeholders/shareholders in all aspects of the developments. This really excited our team, as it gave us the opportunity, through the release of forecasted production information and mine plans from our clients, to display that we could deliver this through energy savings, production increases and reduced capital expenditure throughout the lifecycle of the developments.

Jeremy Sutherland

Directeur de la division Minetek Air