Skip to main content
Nous contacter
Retour aux téléchargements

Power | Agnew Mine case study

  • Puissance
  • Étude de cas

The Agnew Gold Mine experienced challenges with its existing primary ventilation circuit. Debottlenecking was required to achieve their goal of increased production and expanded exploration. Minetek was commissioned to develop a Primary Booster Fan solution, with the full scope including removing redundant equipment and installing the new fans. This solution was an Australian first for a fan of this combined size and technology.

Obtenez votre exemplaire gratuit

Découvrez comment nous assurons la mobilité des mines depuis plus de 40 ans.