跳至主要内容
联系我们
返回下载

Water | Las Lagunas Mine case study

  • 采矿
  • 案例研究
  • 北美

EnviroGold contacted Minetek with a time-sensitive problem involving managing the Tailings Storage Facility (TSF) at their Las Lagunas mine site. They urgently needed to manage water levels in a challenging highly humid environment. The surplus tailings water caused a lack of storage capacity on-site, leading to a potential overflow of TSF. The potential environmental repercussions of a failed TSF were a motivation for Las Lagunas mine to act quickly.

Download Minetek’s Las Lagunas Mine case study to learn more about the site’s Evaporator system solution.

免费获取

了解我们如何在 40 多年的时间里让矿井保持运转。