跳至主要内容
联系我们
返回下载

Air | Golden Grove Mine case study

  • 空气
  • 案例研究
  • 澳大利亚和大洋洲

29Metals commissioned Minetek for a solution to achieve their immediate short-term ventilation needs, that could grow with the mine’s longer-term objectives.

Strict project targets around infrastructure and power constraints were a challenge but Minetek were able to deliver a turn-key solution that provided operational savings.

免费获取

了解我们如何在 40 多年的时间里让矿井保持运转。