29Metals commissioned Minetek for a solution to achieve their immediate short-term ventilation needs, that could grow with the mine’s longer-term objectives.
Strict project targets around infrastructure and power constraints were a challenge but Minetek were able to deliver a turn-key solution that provided operational savings.