跳至主要内容
联系我们
返回下载

Air | Agnew Mine case study

  • 空气
  • 案例研究
  • 澳大利亚和大洋洲

The Agnew Gold Mine experienced challenges with its existing primary ventilation circuit. Minetek was commissioned to develop a Primary Booster Fan solution, with the full scope including removal of redundant equipment and installation of the new fans. This solution was an Australian first for a fan of this combined size and technology.

免费获取

了解我们如何在 40 多年的时间里让矿井保持运转。