Skip to content
Search
Close this search box.
Nevada Gold Mines
SUSTAINABLE SOLUTIONS

Process Water disposal

MINETEK WATER Evaporation Systems

ON SITE, COST-EFFECTIVE MINE WATER MANAGEMENT

A by-product of all mining is process water and the need to store, transfer, treat or remove it to ensure regulatory compliance is universal.

Due to the nature of mine processing, water can become highly contaminated. The mining industry uses large amounts of water for mine processes including washing ore and mine tailings impoundment. As such, mine process wastewater is often polluted with heavy metals and metalloids that necessitate expensive treatment before it is released into the environment or used for any other purpose.

With the capability to evaporate water with high levels of Total Dissolvable Solids (TDS) and Total Suspended Solids (TSS) and pH range as low as 1.8 and as high as 14, Minetek's water evaporation solutions offer versatility and a cost-effective solution to managing mine affected and process water without the need for pre-treatment.

Technical Enquiry

x

Sales Enquiry

x

I have used these evaporators very successfully at mine sites where I have worked in the past. They are an extremely reliable unit and worked above expectations in the environment where we had them set up. As for spray drift/mist this can be controlled by the weather monitoring systems that are available with the units. Additionally, how you set them up and the amount of fall you can achieve allows for more moisture to be stripped from the droplets]will greatly benefit your overall evaporation rates.

Rolleston Coal Operations Manager

MINETEK's installations have been very successful and prompted the contracting of MINETEK to conduct a full mobile fleet and fixed plant noise monitoring assessment at the Acland mine site.

New Hope Group Project Superintendent

Good product with great service leads to a great outcome. My dealings with MINETEK WATER and their supply and service of evaporator fans was one of high quality. I installed 10 evaporator fans on climate control to maximise efficiency and the results were incredible. From the first meeting through to commissioning nothing was a problem for the MINETEK WATER team. I would highly recommend this product to anyone with water disposal issues.

Integra Coal Operations Coal Handling & Preparation Plant (CHPP) Manager

It was completed with no incidents or injuries, with no delays, and ahead of schedule. The plan was for 10 shifts, and it was completed in 7 shifts.

Northern Goldfields Mining Manager

We have placed some difficult demands upon MINETEK. These demands are never an issue, and are met with the enthusiasm and professionalism we have grown to expect from the MINETEK team.

Liebherr Australia Mining Manager
Industries
Resource Centre​

Solutions

Download