Mina de ouro em Gana, África Ocidental - Solução de evaporação de água

Completo evaporação de água e solução elétrica at an African gold mine.

Localização - Accra, Ghana, West Africa
Escopo - 12 x galvanised water evaporators, pontoon-based pumping system & complete electrical package

 

Breve

Minetek’s client required a complete system designed to manage water levels at their gold mine in Ghana, Africa

Desafio

This gold mine required this solution to be developed within a tight timeframe, moving from design approval to installation within 7 weeks.

Solução

Minetek delivered a complete solution including a 12 x mechanical water evaporators with 4 x pontoon-based pumping system. The skid mounted design enables the site to quickly deploy the evaporators at various locations on their site and manage tailings dam levels in all weather conditions.

Minetek also delivered a total electrical solution including a skid mounted Motor Control Centre (MCC), soft starters for both pumps and evaporators, an electrical & control cable package as well as a automation control system and weather station.

A solução incluiu o Sistema de Gerenciamento Ambiental (EMS) patenteado da Minetek, sistema geral, projeto, engenharia, frete e comissionamento e treinamento no local por nossa equipe de especialistas.