Power | Agnew Mine case study

  • Potência
  • Estudo de caso

The Agnew Gold Mine experienced challenges with its existing primary ventilation circuit. Debottlenecking was required to achieve their goal of increased production and expanded exploration. Minetek was commissioned to develop a Primary Booster Fan solution, with the full scope including removing redundant equipment and installing the new fans. This solution was an Australian first for a fan of this combined size and technology.