Vai al contenuto principale
Contatto
Torna ai download

Air | Underground Ventilation solution at Western Australian Gold Mine

  • Aria
  • Conformità
  • Efficienza operativa
  • Miniere
  • Studio di caso
  • Australia e Oceania

Underground Ventilation solution at Western Australian Gold Mine

Minetek provided a tailored ventilation solution for a major gold mine in Western Australia, addressing the need for expansion and regulatory compliance.

The system, featuring six IA 2600mm 630kW primary fans, was delivered in two stages and designed to minimise power consumption. This approach has already led to significant OPEX savings, ensuring the mine remains compliant and efficient throughout its operations.

To learn more about how much Minetek saved the gold mine, download the case study.

Ottenete la vostra copia gratuita

Scoprite come abbiamo mantenuto le miniere in movimento per oltre 40 anni.