Vai al contenuto principale
Contatto
Torna ai casi di studio

Eastern Region, Ghana – Water Evaporation Solution

Dewatering solution for a Gold Mine in Eastern Region, Ghana.

In the Eastern Region of Ghana, a gold mining operation faced challenges with managing excess water in their tailings dam. To address this, Minetek Water provided a tailored solution with the installation of a 400/200 Evaporation System Package. This advanced system, capable of handling a volume throughput of 90 m³ per hour (400 GPM), enabled the site to efficiently manage water levels and maintain regulatory compliance. The deployment of this system not only optimised water management but also ensured more sustainable and cost-effective operations for the mining company.

Posizione - Eastern Region, Ghana
Industria - Miniere d'oro
Applicazione - Gestione della diga sugli sterili
Prodotto - 1 x 400/200 Pacchetto sistema di evaporazione
Volume di produzione - 90 m3/ora (400 GPM)