Loncat ke konten utama
Kembali ke studi kasus

Lualaba, Tambang Tembaga & Kobalt Kongo - Solusi Penguapan Air

Copper and cobalt producer turns to Minetek for pengelolaan air yang efektif

This is located in the Democratic Republic of Congo and produces approximately 200,000 metric tons of copper and 18,000 metric tones of cobalt per year.

Lokasi - Lualaba Province, Democractic Republic of Congo
Ketik - Copper and Cobalt
Industri - Pengelolaan Air
Aplikasi - Pengelolaan Bendungan Tailing
Produk - Paket Sistem Penguapan Air
Volume keluaran m3 + GPM - 720 m3/jam (3.200 GPM)

The Project

Minetek was commissioned to supply eight 8 x  large  evaporators to this copper and cobalt mine mine to assist in the management of wastewater from the copper and cobalt plant. The system was installed on the site tailings pond and operated for a number of years before the tailings pond was beached. The Minetek evaporators were manufactured out of 316 Stainless Steel to withstand the highly corrosive environment that they were operating in. Minetek supplied the entire system including MCC, pumps, cable pipework, commissioning and training.