EnviroGold contacted Minetek with a time-sensitive problem involving managing the Tailings Storage Facility (TSF) at their Las Lagunas mine site. They urgently needed to manage water levels in a challenging highly humid environment. The surplus tailings water caused a lack of storage capacity on-site, leading to a potential overflow of TSF. The potential environmental repercussions of a failed TSF were a motivation for Las Lagunas mine to act quickly.

Download Minetek’s Las Lagunas Mine case study to learn more about the site’s Evaporator system solution.