Dewatering solution for Gold Mine in Russia
Minetek Water provided a tailored tailings dam evaporation solution for a gold mining operation in Krasnoyarsk Krai, Russia. The project involved a single 600/300 Evaporation System Package designed to meet the specific water management requirements of the site. This system achieved a volume throughput of 135 cubic meters per hour (600 gallons per minute), effectively managing the water levels within the tailings dam. This deployment showcases Minetek Water’s expertise in delivering flexible and efficient evaporation solutions for the mining industry, ensuring sustainable water management practices and compliance with environmental standards.
Ubicación - Krasnoyarsk Krai
Industria - Minería de oro
Aplicación - Evaporación de la presa de relaves
Producto - 1 x 600/300 Evaporation System Package
Volumen de producción - 135 m3/hour (600 GPM)