The Agnew Gold Mine experienced challenges with its existing primary ventilation circuit. Minetek was commissioned to develop a Primary Booster Fan solution, with the full scope including removal of redundant equipment and installation of the new fans. This solution was an Australian first for a fan of this combined size and technology.