跳至主要内容
联系我们
返回下载

Power | Agnew Mine case study

  • 电源
  • 案例研究

The Agnew Gold Mine experienced challenges with its existing primary ventilation circuit. Debottlenecking was required to achieve their goal of increased production and expanded exploration. Minetek was commissioned to develop a Primary Booster Fan solution, with the full scope including removing redundant equipment and installing the new fans. This solution was an Australian first for a fan of this combined size and technology.

免费获取

了解我们如何在 40 多年的时间里让矿井保持运转。