Перейти к основному содержанию
Свяжитесь с нами

Landfill Water Management

Minetek provides an efficient and cost-effective solution to managing landfill water. Our solution ensures the site and surrounding environment can mitigate both short and long-term environmental impacts.

Solutions to managing landfill water

Landfills must safely and effectively manage hazardous liquid waste to meet organisational objectives, remain compliant and protect the surrounding environment and communities. Minetek offers an effective solution for industrial and municipal sites requiring ad hoc or long-term landfill water treatment or leachate management. Our evaporation technology can process varying water qualities, including solids up to 4.0mm in diameter and wastewater with a pH level ranging from 1.8 to 14+, reducing dam water levels and providing a long-term water balance mitigation solution.

Cost savings

Significantly reduce operational costs by minimising the need for off-site disposal and landfill water treatment costs.

 

Environmental responsibility

Minimise your environmental impact by eliminating the need for traditional liquid waste disposal methods and reducing the risk of excess water storage.

Mobile & scalable solution

Our systems can adapt to the evolving needs of your oil & gas operations, ensuring they remain effective as you grow.

Regulatory compliance

Minetek helps you navigate and exceed stringent environmental regulations, ensuring your activities remain compliant.

Landfill Waste Management Case Study

Minetek provided a dewatering solution for this waste management and disposal centre, which had a large leachate dam that needed to be filled in for complete site rehabilitation. Over 60 million litres of landfill water needed to be removed as soon as possible, with an allowance period of 12–18 months for the project. Minetek supplied a 200/100 Land Based Water Evaporator system and with an evaporation efficiency of 52%, our unit removed 280,800 litres of water from the site per 12-hour-day, achieving the client’s dewatering goal in just 9 months.