本文へスキップ
お問い合わせ
ダウンロードに戻る

Water | Coal Fired Power Station case study

  • ケーススタディ
  • 北米

Minetek’s coal-fired power station client, located in Montana, United States, was dealing with significant volumes of brine wastewater and needed a management system large enough to efficiently manage the high volume of brine wastewater onsite.

After considering a number of alternate, costly solutions including a brine concentrator, this coal-fired power station approached Minetek for an efficient and cost-effective solution.

無料コピーを入手する

40年以上にわたって鉱山を移動させ続けてきた方法をご覧ください。